At a glance
| Benefit | Value or rule | What to do |
|---|---|---|
| Residential Solar and Storage Equity (RSSE), AB 209 | Published base rates: solar $3,100/kW; storage $1,100/kWh. Actual incentives depend on approved design, eligible costs and other support. | Check low-income eligibility and the correct administrator budget before relying on funding. |
| Funding as of September 23, 2026 | PG&E/SCE public-utility sub-budgets open; their non-POU budgets and CSE/SoCalGas/LADWP AB 209 budgets waitlisted. | Find the applicable budget below. A waitlist is not an approved award. |
| Application deadline | AB 209 new and waitlist applications: June 30, 2028. Funds can become unavailable sooner. | Residential incentive claims normally due within 12 months of the Confirmed Reservation Letter. |
| Net Billing Tariff | Export compensation is separate from an installation incentive. | Check the utility tariff for your interconnection date and project. |
Is California SGIP funding open or waitlisted?
The official dashboard displayed the following RSSE status on September 23, 2026. POU means publicly owned electric utility; the administrator is not necessarily the utility on your electric bill. These are dated programme balances, not funds reserved for you. Source: SGIP Incentive Step Tracker.
| AB 209 budget / administrator | Status | Dashboard “Available Funds” |
|---|---|---|
| POU customers assigned to PG&E | Open | $7,200,401.52 |
| POU customers assigned to SCE | Open | $1,000,000.00 |
| Non-POU / PG&E | Waitlist | $3,529,143.33 |
| Non-POU / SCE | Waitlist | $1,352,735.24 |
| CSE (including SDG&E customers) | Waitlist | $2,503.72 |
| SoCalGas (SCG) | Waitlist | $306,838.52 |
| LADWP | Waitlist | $496,486.55 |
A positive balance does not override “Waitlist.” Do not treat these displayed amounts as immediately claimable money. The dashboard separately tracks non-tribal reservation caps, and the administrator must confirm your application category and queue. Recheck the official dashboard before committing to a project.
Closed, not merely waitlisted: the separate ratepayer-funded RSSE budgets at CSE, SCE, SoCalGas and PG&E are closed. The handbook sets December 30, 2025 as the deadline for new ratepayer-funded applications and closure of their waitlists. AB 209 is a different funding source; its June 30, 2028 deadline does not reopen those older budgets. Handbook §1.1, printed pp.10–11.
Which administrator and budget apply to your utility?
For PG&E and SCE electric customers, use that utility’s non-POU AB 209 budget—not the open POU allocation. SDG&E customers use the Center for Sustainable Energy (CSE); LADWP customers use LADWP. Community-choice electricity service does not make a customer a POU customer: the official list assigns, for example, Clean Power Alliance to SCE and Ava Community Energy to PG&E.
Other utilities have specific assignments. SMUD, Roseville Electric and Alameda Municipal Power are assigned to PG&E; Pechanga Western Electric and Victorville Municipal Utilities Services are assigned to SCE. Burbank Water and Power and Pasadena Water and Power are assigned to SoCalGas. Use the official utility-to-administrator lookup; do not choose an administrator simply because its dashboard says open.
Who qualifies for the low-income incentive?
For a single-family home, the 2026 V3 handbook provides two income pathways: document household income at or below 80% of area median income, or show completed income verification through SASH, DAC-SASH, CARE, FERA or ESA. The threshold depends on the applicable area and household; there is no single California dollar limit. CARE/FERA/ESA enrolment without the required income verification is not enough. Later loss of qualifying eligibility before payment can cancel the application. §3.2.1, p.24; §8.1, p.94.
Multifamily properties have separate deed-restricted housing, disadvantaged-community/income or MASH/SOMAH pathways; do not apply the single-family shortcut to a whole apartment building. New solar systems are supported, not additions of panels to an existing solar system. Factory-new, qualifying permanent equipment and utility interconnection are required; emergency-only backup equipment is ineligible. pp.22–24, 41–42, 54–55 and 76.
How much can SGIP actually pay?
The base RSSE rates are $3.10/W of solar and $1.10/Wh of storage ($3,100/kW and $1,100/kWh). Solar uses the programme’s CEC-AC/design-adjusted Expected Performance Based Buydown calculation, including an inverter limit—not simply the panel nameplate kW. Storage incentive calculations include discharge-duration reductions. Single-family storage incentives are capped at 30 kWh; above 15 kWh, load justification is required. The 15 kWh threshold is not a household’s guaranteed allocation. §§4.1.2–4.2.4, pp.39–43; §6.3, p.63.
The payment cannot exceed verified total eligible project costs. Other incentives and applicable tax credits can reduce the SGIP share. The current handbook requires extra cost verification for RSSE projects reporting eligible costs above 90% of the calculated maximum incentive. A quote promising the full headline amount before cost and design review is not an award. §§4.5.2–4.5.6, pp.47–54.
2026 ownership detail: the handbook removes the requirement to prove federal-credit ineligibility for single-family customer-owned projects with permission to operate after December 31, 2025. It still requires an explanation of why the project could not be third-party owned when seeking the full SGIP incentive under that pathway. This is not automatic 100% funding and does not revive the expired homeowner federal credit. Have the administrator confirm how ownership and other incentives affect the reserved amount. §§4.5.6–4.5.6.1, pp.52–54.
Application order, installation timing and deadlines
- Before committing to installation: confirm the assigned administrator, low-income documents, current budget/queue, eligible equipment, sizing and ownership route. Check the approved developer list; listing is not a CPUC endorsement. Confirm equipment remains eligible before purchase or installation.
- Submit a complete Reservation Request Form (RRF) and required documents through the official SGIP application portal, normally with the developer. The residential process is RRF → Confirmed Reservation Letter → Incentive Claim Form (ICF). Only complete applications can receive an approved reservation; an application or waitlist place does not reserve a payment.
- Do not assume SGIP always requires application before installation. The handbook allows qualifying systems to receive a reservation up to 12 months after utility permission to operate (PTO). If PTO already exists, disclose its date; requests with a PTO date more than 12 months before RRF submission are rejected. Confirm your timing with the administrator before relying on this route. Applying early helps expose funding and eligibility risks; it is not a funding guarantee.
- Complete, interconnect and operate the approved system, then file the ICF with required cost and completion evidence, normally no later than 12 months after the Confirmed Reservation Letter. Inspection and approval precede payment. Extensions require approval and are not automatic.
- Meet operating conditions. Residential storage generally requires 52 equivalent full discharges per year and an SGIP-approved rate. Importantly, low-income RSSE applicants are exempt from the qualifying demand-response participation requirement under the current handbook; the CPUC overview’s general wording does not state this exception. Other equipment, efficiency, rate and operating rules still apply.
Outer deadline: new AB 209 and waitlist applications must be submitted by June 30, 2028. That is not a promise that funding remains open until then, nor an extension of your individual reservation. Sources: 2026 V3 handbook pp.11–13, 20, 55, 58–59, 62 and 76.
SGIP and net billing are different
SGIP helps with qualifying installation costs. Net billing determines how electricity exports are credited on a utility bill. For new systems under the Net Billing Tariff, export value is time-dependent rather than a simple full-retail credit. Municipal utility rules may differ. Request a solar-only and a solar-plus-storage model using your actual tariff and household consumption.
A portable battery comparison does not establish SGIP eligibility. Check the programme’s approved equipment and permanent-installation requirements instead of relying on marketing descriptions.
Official sources and application routes
Reviewed September 23, 2026. Handbook: programme year 2026, version V3, retrieved from the official 2026 download. Funding table: dashboard dated September 23, 2026. Page references above use the handbook’s printed page numbers (PDF page is one higher).
- Official SGIP resources and current handbook · 2026 handbook download (ZIP; use V3)
- Official SGIP funding-status dashboard — select the exact RSSE AB 209 / POU / Non-POU category.
- AB 209 utility-to-administrator assignments
- Official SGIP application portal · Administrator contacts
- CPUC programme overview — use the current handbook for detailed exceptions and deadlines.
Compare other states → · How we verify information · Report a correction